DHA City Karachi
The new master-planned city on the Superhighway.
DHA City Karachi
Karachi, Sindh · 22 phases and sectors
What is nearby
50 places in and around the society
- DCK Junior SchoolSector 3 · Kindergarten and junior school operating in Sector 3
- DHACSS High School (DHA City campus)DHA colleges and school system high school inside the city
- Roots Millennium School, DHA City CampusListed among the city's educational facilities (2026)
- Shaukat Khanum Memorial Cancer Hospital & Research CentreCancer hospital on a 20-acre site given by DHA; groundbreaking Dec 2016; opening targeted for Dec 2026
- Dow University Hospital (DHA City)Sector 3 · Constituent teaching hospital of Dow University; inaugurated Feb 2018
- DHA Suffa University ComplexExisting block plus a planned complex in the Education District
- IBA DHA City CampusCampus agreed in Mar 2016 for the Education District; operating status not confirmed
- Fairwinds ClubhouseFairwinds Golf & Country Club · Planned gym, pool, sauna, bowling alley, pro-shop, restaurants and cafes
- Oasis ClubDHA Oasis (Farmhouses) · Community club with pool, snooker room and dining; events for 150-200 guests
- Thrill Hills Adventure ParkZip line, sky cycle, suspension bridge, paintball, archery; opened 2025
- CBD ParkCBD Commercial · Planned 4.8-acre landscaped park in the business district
- CBD Business District and Market DistrictCBD Commercial · Commercial and mixed-use plots of 300-2,000 sq yd
- District One commercial zonePlanned 11.6-acre ground-plus-one retail and office zone on Allama Iqbal Avenue, next to the Expo Centre
- DHAC Medical Centre24/7 emergency centre with an added specialist block for residents and private patients
- NUTECH Skill Development CentreSkills training centre listed among educational facilities
- Fairwinds Golf & Country ClubFairwinds Golf & Country Club · 18-hole championship course designed by Sir Nick Faldo; completion targeted 2027
- ICON MallMall named among the city's projects (2024)
- ARY LagunaMan-made crystal lagoon with artificial beach and towers; booking and ballot from Jun 2021
- Sector mosquesMosques provided in sectors and sub-sectors; a grand mosque for about 1,000 worshippers is planned
- PSO fuel station on M-9 near DHA CityFuel station on the motorway at the edge of the society
- DHA City Restaurant (M-9)Roadside restaurant at the edge of the society
- PEC ComplexEngineering council complex in the Education District
- ICAP Centre of ExcellenceChartered accountants' training centre in the Education District
- Education DistrictCBD Commercial · Purpose-built district for institutes; about 103 acres per a 2016 report
- Healthcare DistrictPlanned medical district with 2-10 acre plots, near the cancer hospital
- Golf ResidenciaFairwinds Golf & Country Club · Golf-themed mixed residential and hospitality zone around the course
- Arts & Culture DistrictCBD Commercial · Planned 14-acre amenity district for galleries, theatres and studios
- DHA City Expo CentreExhibition centre near the main entrance (Gateway District)
- Gateway PrimeMixed-use residential and commercial towers in the Gateway District
- +21 more
Utilities
Charges
As of the dates shown; ZN confirms current amounts
- Transfer fee, residential plot, Cat A/DS memberRs 100 per sq yd2026-07
- Transfer fee, residential plot, Cat B memberRs 200 per sq yd2026-07
- Transfer fee, residential plot, corporate bodyRs 300 per sq yd2026-07
- Transfer fee, residential plot, foreigner/POC holderRs 600 per sq yd2026-07
- Gift (hiba) of residential plot by a Pakistani memberRs 70 per sq yd2026-07
- Transfer fee, commercial plot, Cat A/DS memberRs 370 per sq yd (Rs 380 in CBD)2026-07
- Transfer fee, commercial plot, Cat B memberRs 540 per sq yd (Rs 550 in CBD)2026-07
- Transfer fee, constructed property incl. town houses 14B and villas 3B, individualRs 50,000 per case2026-07
- Transfer fee, constructed property, corporate body or foreignerRs 300,000 per case2026-07
- Transfer fee, DHA Oasis farmhouse to an individualRs 600,000 to Rs 900,000 by farmhouse size2026-07
- Same-day sign before feeRs 60,0002026-07
- 5-day urgent transfer order feeRs 60,0002026-07
- Legal heirs transfer (farmhouse)Rs 12,0002026-07
- Membership, Cat A armed forces (initial / renewal)Rs 34,500 / Rs 3,5002026-07
Building rules
Key construction rules; ZN checks the latest rules for your plot before you build
Residential plots up to 250 sq yd may cover 90% of the plot; 251-450 sq yd 75%; 451-800 sq yd 65%; 801-1,800 sq yd 55%; 1,801 sq yd and above 50%.
Front open space: 4 ft (up to 150 sq yd), 5 ft (151-350), 8 ft (351-450), 10 ft (451-800), 20 ft (801-1,800), 30 ft (1,801+). Rear/side: none up to 250 sq yd; 3-4 ft rear and 5 ft on one side for 251-450; 6 ft rear and 5 ft sides for 451-800; 10 ft rear and sides for 801-1,800; 15 ft for 1,801+.
All house sizes allow basement + ground + one floor. Ground floor up to 14 ft, first floor up to 12 ft, main building up to 31 ft to the roof slab and up to 43 ft overall including the stair tower with lift shaft. Plinth 2-4 ft above road level.
A mumty (roof room) is allowed only on cul-de-sac plots in selected sectors, up to a 14 x 16 ft room with an 8 x 10 ft bath, no windows facing neighbours.
One basement up to the ground-floor footprint; extra basements only with ground-condition proof. Clear height 8 ft 6 in to 10 ft; RCC retaining walls; walls next to completed houses must be finished within 15 days of digging; front open space left untouched; no commercial use of residential basements.
House boundary walls 6-8 ft above road crown; a 2 ft iron barrier on top only with special permission and extra charges. No boundary walls, fences or gates for commercial buildings; none for education and medical plots.
A building must be completed within three years of plan approval. Up to one year extension may be given if asked one month before expiry, and one more year in extreme cases; late-completion penalty applies after that.
Approval is needed for new (proposed) and revised building plans; structural design and vetting are compulsory for every house regardless of height. Changes during construction need a deviation approval, otherwise a penalty is charged.
Stage-wise construction NOCs (basement, plinth, ground, upper floors, stair tower) are inspected and issued within about 15 working days each.
The demarcation letter (physical plot boundaries) should ideally be taken within three months of building plan approval.
Completion plans must be submitted within 30 days of finishing work. Occupancy is allowed only after an occupancy certificate; the minimum is a fully finished ground floor. Occupying without approval draws a penalty.
A plot may be used only for its allotted purpose. In mixed-use buildings retail is allowed only on ground floor and basement, with homes above; cooking is not allowed in commercial basements.
Farmhouses (DHA Oasis): detached servant block up to 450 sq ft and an annexe up to 1,000 sq ft (optional basement up to 1,000 sq ft) in rear/side open space; front facade and colour scheme stay unchanged; boundary wall up to 10 ft; tapered roof up to 20 ft, flat roofs not allowed.
Timeline
Launches, ballots and possession announcements
- 2026-10Power takeover
Scheduled start of supply by the city's own power company (1 Oct 2026)
- 2026-09Master plan · Sector 8
Sector 8C master plan and updated city master plan published
- 2026-07Fee revision
New transfer and membership fees effective 13 Jul 2026
- 2026-07Power licence
Own power company licensed to supply the city for about 20 years
- 2026-06Master plan · Sector 12
Sector 12 A-B master plan published
- 2026-05Road link
39 km signal-free expressway fully opened from central Karachi to Kathore on the M-9
- 2026-05Ballot · DHA Indus Hills
Overseas Enclave plot allocation ballot
- 2026-04Progress · Sector 3
Infrastructure in Sectors 3C and 3D about 50% done; 6E, 6F, 6G named next
- 2026-04Road link
Agreement for an underpass from the M-9 to the main gate
- 2026-04Launch · Woodlands
Woodlands villa project launched on 18 Apr 2026 with groundbreaking
- 2025-11Handover · DHA Indus Hills
Allocation/intimation letters issued for DHA Indus Hills
- 2025-10Opening · DHA Indus Hills
Thrill Hills adventure park opened; Indus Hills allocation ballot completed
- 2025-01Road link
First part of the expressway opened, linking DHA Karachi to the M-9 near Kathore
- 2024-12Partnership · Woodlands
Development partnership signed for a 15-acre villa project (later Woodlands)
- 2024-09Groundbreaking · Fairwinds Golf & Country Club
Groundbreaking of the Fairwinds golf course; completion targeted 2027
- 2023-09Ballot · Sector 14
Ballot of 115 town house plots (Phase II) in Sector 14
- 2023-04Launch · Fairwinds Golf & Country Club
Fairwinds golf course and country club unveiled with its designer
- 2022-03Handover · DHA Oasis (Farmhouses)
Keys handed to DHA Oasis farmhouse owners
- 2022-03Ballot · Sector 3
Ballot of ready villas (130-700 sq yd) in Sector 3
- 2021-06Launch
ARY Laguna lagoon project opened booking and held its first ballot
