DHA Peshawar

Modern sectors with the Khyber mountains on the horizon.

All DHAs

DHA Peshawar

Peshawar, Khyber Pakhtunkhwa · 7 phases and sectors

What is nearby

54 places in and around the society

Parks 8 Mosques 6 Schools 5 Markets 4 Clinics 2 Clubs 2 Fire stations 1 Police 1 Fuel stations 1 Food streets 1 Malls 1 Grid stations 1 Graveyards 1 Other places 20
Parks
  • Sector A park (south)
    Sector A · One of several sector parks; Sector A parks listed as completed
  • Sector A park (west)
    Sector A · Sector park near the western edge
  • Sector A2 park
    Sector A · Park in the A2 sub-area
  • Sector B park
    Sector B · One of three parks in Sector B
  • Sector C park
    Sector C · One of three parks in Sector C
  • Prism park and recreational area
    Sector Prism (D Prism) · Green area beside the Prism apartment blocks
  • Adventure Arena
    Outdoor activity park (zipline, ATV track); operational
  • DHA water stream
    Landscaped water channel; completed project
Mosques
  • Sector A mosque
    Sector A · Sector mosque on the official layout
  • Sector B mosque
    Sector B · Sector mosque
  • Sector C mosque
    Sector C · Sector mosque
  • Sector Prism mosque (south)
    Sector Prism (D Prism) · One of two mosque sites in Prism
  • Sector Prism mosque (north)
    Sector Prism (D Prism) · Second mosque site in Prism
  • Jamia Masjid
    First central mosque, opened to the public in 2022
Schools
  • Sector A school site
    Sector A · School plot on the official sector layout
  • Sector B school site
    Sector B · School plot on the official sector layout
  • Sector C school site
    Sector C · School plot on the official sector layout
  • Education institute site (Central Commercial District)
    Nasir Bagh Commercial / Central Commercial District · Education plot on the commercial layout; an international-standard education institute is listed as completed, link to this plot not confirmed
  • Future World School & College (Roots Millennium)
    Private school campus inaugurated in 2024
Markets
  • Sector A mini mart
    Sector A · Neighbourhood mart next to the sector mosque
  • B Mart
    Sector B · Sector B mini mart; a clinic operates here
  • Sector C mini mart
    Sector C · Neighbourhood mart
  • Commercial Zone A
    Sector A · Commercial zone in Sector A; development started 2024
Clinics
  • Clinic at B Mart
    Sector B · Basic clinic inside the Sector B mart
  • Health Center (planned)
    Health centre listed as an upcoming project; no hospital inside yet
Clubs
  • DHA gym
    Gym opened to the public
  • Riding club
    Horse riding club listed as an amenity by a property portal
Fire stations
  • Rescue 1122 centre
    Emergency rescue and fire service centre inaugurated in the society
Police
  • Nasir Bagh Police Station
    Police station on the Nasir Bagh Road side; listed as a completed project
Fuel stations
  • PSO filling station
    Fuel station operational since 2023
Food streets
  • Chai Shai
    Cafe-restaurant among the listed in-society outlets
Malls
  • D Mall
    Planned mixed-use tower: 3 basements, lower ground and 13 floors with shops, food court, offices and 1-3 bed flats; unit ballot held Dec 2021
Grid stations
  • Grid station
    Listed as an amenity by a property portal; not confirmed on official pages
Graveyards
  • Graveyard
    Listed as an amenity by a property portal; not confirmed on official pages
Other places
  • Sector A Sports Arena
    Sector A · Sports arena project under construction
  • Prism apartment blocks
    Sector Prism (D Prism) · Five apartment blocks on the official layout
  • Prism Complex
    Sector Prism (D Prism) · Completed DHA complex in Sector Prism
  • DHA facilities site (Northern Bypass side)
    Sector Prism (D Prism) · DHA facilities plot next to the main gate
  • Northern Bypass main entrance gate
    Sector Prism (D Prism) · Main gate on the Northern Bypass, east side of Prism; built 2022
  • D Chowk
    Roundabout on the Northern Bypass at the Prism end
  • Pakistan Chowk
    Central roundabout where Sectors A, B and C meet; completed project
  • Nerve Center
    Smart-city monitoring and control centre, inaugurated 2025
  • +12 more

Utilities

Electricity
PESCO
Grid supply; rooftop solar capped under distribution-company rules
Gas
SNGPL
Sui gas supply listed among facilities
Water
DHA own
Sector water filtration plants in A, B and C; DHA connections
Sewerage
DHA own
Permanent connections issued by DHA
Garbage
DHA own
Garbage collection and cleaning by DHA
Security
DHA own
Gated; security control room, CCTV, Nerve Center, Rescue 1122 centre
Internet
Mobile operators
Mobile network coverage including 4G; no fibre provider confirmed

Charges

As of the dates shown; ZN confirms current amounts

  • Original development charges paid (instalment plan to Feb 2021) - 125 / 250 / 500 / 1,000 sq ydRs 965,330 / Rs 1,625,000 / Rs 2,250,000 / Rs 3,765,0002021-02
  • Additional development charges demanded - 125 / 250 / 500 / 1,000 sq yd (about 39-41% extra; challenged in court, cancellations stayed Dec 2024)Rs 380,000 / Rs 660,000 / Rs 930,000 / Rs 1,530,0002024-03
  • Surcharge on late development charges - service-benefit / land owner or investor / Penta Square12% / 14% / 6% per year
  • Drawing approval - commercial plotsRs 30,000 per marla (Rs 120,000 for 4 marla, Rs 600,000 for 1 kanal)
  • Amalgamation of commercial plotsRs 15,000 per marla of added area
  • Site plan and demarcation (commercial schedule)Rs 20,000
  • Permanent water / sewerage connection (commercial schedule)Rs 20,000
  • Site inspections and completion certificate (commercial schedule)Rs 50,000
  • Security charges (commercial schedule)Rs 10,000 per year
  • Refundable construction security fee - 400 sq yd and above / below 400 sq ydRs 50,000 / Rs 30,000
  • Fine for demarcation violation (commercial)Rs 25,000 per marla
  • Late completion charges - commercial buildingsRs 75,000 per month
  • Debris removal - commercial plots up to 8 marla / 8-16 marla / 16-32 marla / above 32 marlaRs 40,000 / Rs 60,000 / Rs 90,000 / Rs 5,000 per marla
  • Corner plot charge on direct sale of location plots10% of launch price plus development charges

Building rules

Key construction rules; ZN checks the latest rules for your plot before you build

Covered area2019-07

Ground-floor coverage including car porch: up to 6 marla 85%; above 6 to 9 marla 75%; above 9 to 15 marla 70%; above 15 to 25 marla 68%; above 25 to 35 marla 65%; above 35 to 60 marla 60%; above 60 marla 55%. First floor follows the ground-floor footprint.

Setbacks2019-07

Front/rear/side open spaces (ft): up to 6 marla 5/3/none; 6-9 marla 7/3/3; 9-15 marla 10/5/5; 15-25 marla 15/7/5 plus 5 on the porch side; 25-35 marla 18/10/6/6; 35-60 marla 20/12/8/8; above 60 marla 30/15/10/10.

Setbacks2023

For 1-kanal plots the rear open space is relaxed from 7 ft to 5 ft (front 15 ft, sides 5 ft each).

Setbacks2019-07

Front setback on standard plots can be relaxed by up to 1 ft (up to 10 marla) or 2 ft (10 marla and above) on payment of regularisation charges.

Setbacks2026

Stairs are not allowed inside the compulsory open spaces; they must be built inside the building line.

Height2019-07

Houses are basement + ground + one floor. Building height including top roof slab 22.5-28.5 ft; overall height with stair hall 30-37 ft; plinth 1-3.5 ft above road level; parapet 3-4 ft.

Height2026

Maximum building height is 37 ft. A lift machine room may get up to 7 ft extra (44 ft) with technical approval; beyond 41 ft after lift installation a fine of Rs 100,000 per extra inch applies or the lift must be changed.

Height2026

Solar panels may not rise above mumty level (37 ft), relaxable to 42 ft; on a mumty or overhead tank they may sit at most 4 ft high. System size is capped at 150% of sanctioned load (about 7.5 kW for 5 marla up to 23 kW for 2 kanal); extra panels are removed with a Rs 100,000 fine per panel.

Height2019-07

Mumty (stair tower) covered area: up to 5 marla 200 sq ft; up to 8 marla 200 sq ft (extendable to 250); up to 10 marla 250 (to 300); up to 1 kanal 300 (to 400); 2 kanal and above 400 (to 700). Overhead tanks are not allowed on the mumty.

Basement2019-07

A basement is allowed within the ground-floor footprint; a second basement only if ground conditions justify it. Clear height at least 8 ft 6 in; walls next to completed houses must be finished within 15 days of digging; RCC retaining walls; parking allowed; no commercial use; front open space must not be dug.

Boundary wall2026

Boundary wall height from road level 5.5-8 ft. A 2 ft iron barrier on top may be allowed with extra charges. Electric fencing up to 2 ft above the wall is allowed with prior approval (not on roofs), low-voltage pulsed current only.

Construction period2019-07

Construction must start within 1 year and a house must be completed within 2.5 years of drawing approval (commercial buildings within 4 years). One extension of up to 1 year may be given if applied for a month before the deadline, and a second in extreme cases with late-completion penalty.

Non-construction penalty

Commercial plots not completed within 4 years pay a yearly fine of Rs 5,000 per marla (Rs 20,000 for 4 marla, Rs 100,000 for 1 kanal). A separate yearly non-utilisation fee of Rs 30,000 per marla applies to commercial plots and Rs 40,000 per marla to sector shops.

Map approval2019-07

Steps: possession NOC and demarcation, then drawings with owner undertaking and dues, architect, engineer and structural-soundness certificates; construction NOC is issued within about two months. Structural design and vetting are compulsory for every house.

Map approval2024-08

A possession NOC stays valid for 6 months before construction starts; all possession NOCs issued before 30 Aug 2024 were cancelled.

Completion certificate2019-07

Completion plans (5 sets) must be submitted within 30 days of finishing the work; the building may not be occupied before completion approval. Late submission draws a penalty.

Commercial use2019-07

No shops, offices, godowns, parlours, tuition centres, clubs, guest houses or hostels in residential houses, and no regular use as a place of worship or for functions. Residential-to-commercial conversion is only allowed under a notified area-wide policy after a public notice.

Commercial use2020

Sector and neighbourhood commercial buildings may go up to basement + ground + 3 floors, with a maximum height of 65 ft.

Other2026

Up to four 1-kanal plots sharing a side can be annexed under one owner. Annexed plots stay lawns with only temporary structures up to 10 ft; a swimming pool (plot 4,500 sq ft or more, max 40 x 20 x 6.5 ft) needs a Rs 300,000 approval. Annexation lapses if either plot is sold separately.

Other2026

Unauthorised permanent construction on an annexed plot is fined Rs 500,000 plus demolition; unauthorised temporary works Rs 250,000.

Other2026

Extra land next to a plot is sold at market price if built on, 30% of market price if only walled, or Rs 1,500 per sq ft as outside lawn; any piece over 2,275 sq ft becomes a separate DHA plot.

Other2026

Plots under 95% of their category size get proportionate bylaw relaxation instead of money compensation.

Other2019-07

Residential plots can be amalgamated up to 4 kanal and commercial plots up to 32 marla. Construction without approval is demolished at the owner's cost if not regularised within 3 months.

Timeline

Launches, ballots and possession announcements

  1. 2026-09
    Ballot 2026

    Ballot on 10 Sep 2026 for affidavit files and intimation letters issued by 5 Sep 2026 with dues cleared

  2. 2026
    Amended bylaws

    Policies on annexation, solar, electric fences, lift height, extra land and undersized plots

  3. 2025
    Sector E groundbreaking · Sectors D, E, F, H, I, J

    Development of Sector E started

  4. 2025
    Nerve Center and underpass

    Smart-city Nerve Center inaugurated; Northern Bypass underpass construction started; 8,000-plant tree drive

  5. 2024-12
    Court stays plot cancellations

    High court stopped cancellation of plots over unpaid additional development charges

  6. 2024-08
    Possession NOCs reset

    Possession NOCs issued before 30 Aug 2024 cancelled; new ones valid 6 months

  7. 2024-05
    Commercial Zone A layout · Sector A

    Revised Commercial Zone A map issued; zone development started 2024

  8. 2024-03
    Additional development charges

    Letters demanded about 41% extra development charges from Phase 1 owners

  9. 2024
    Sector G completed · Sector G / G-1

    Sector G development completed and inaugurated; private school campus opened

  10. 2023
    Sector Prism inaugurated · Sector Prism (D Prism)

    Prism opened; fuel station operational

  11. 2022
    Sector G started; offices on site · Sector G / G-1

    Sector G works began, DHA offices moved to site, Northern Bypass gate built, 5- and 10-marla houses built, Jamia Masjid opened

  12. 2021-12
    D Mall ballot

    Computerised ballot for D Mall units held 31 Dec 2021

  13. 2021
    Prism and Commercial Zone B development · Sector Prism (D Prism)

    Development of Sector Prism and Commercial Zone B started

  14. 2020
    Commercial launch · Nasir Bagh Commercial / Central Commercial District

    Public launch of commercial plots; 4- and 8-marla commercial ballot results

  15. 2019
    First houses

    1-kanal houses built; construction regulations issued Jul 2019

  16. 2018
    Development of A, B and C

    Infrastructure work began in the first three sectors

  17. 2017
    Plot allotment ballot

    Allotment balloting of residential plots

  18. 2016-05
    Urgent transfer service

    Two-day urgent transfer started at extra charge

  19. 2016-03
    First computerised ballot

    Phase I ballot held 4 Mar 2016; letters sent to successful applicants

  20. 2015-12
    Application window closes

    Applications for 10-marla and 1-kanal plots collected through banks